Redwood ADU, Built in Sacramento Request a Consult

Built in Sacramento

Attention to the job, not to the next sale.

Max is on site in every Redwood ADU project. The person who writes your contract is the person who builds it.

We keep our schedule to the jobs we already have and build them well. No sales team and no overbooking: when we take your job, it gets our full attention.

See Our Work Request a Consult

Two-story stucco ADU by Redwood ADU on Myrtle Ave., West Sacramento, with a covered porch Finished Gastman Way ADU in Fair Oaks with stucco walls, a shingle roof and a covered front porch Finished two-story U St. ADU in Sacramento with black French doors
  • Max on every job
    Sales, permits and the build, one person
  • over 80% in-house
    Foundation and plumbing self-performed
  • Two jobs at a time
    We only run two, so yours never stalls
  • Design + build in-house
    Max designs it in 3D, our crew builds it

Build quality

Details we include that others don’t

  • Washer/Dryer Boxes

    We include an inset washer hookup box with water supply and drain. Also, we include an inset dryer exhaust cavity so the dryer hose fits neatly in the wall and the dryer can slide all the way back to the wall.

  • Superior Window Flashing

    For a durable, leak-resistant window installation, we use a couple of specialty products. First, we use a high-quality oil-based sealant between window flange and wall. Next, we use an upgraded Butyl flashing tape to flash the exterior of the window to the wall.

  • Silicone in Tile Inside Corners

    Inside corners are the first places grout will crack as the building experiences slight movement over time. For this reason, before installing grout, we use silicone at all critical joints, and any joints prone to cracking. This helps keep those joints sealed and watertight over time.

  • Roll-on Moisture Barrier under Tile

    Whenever we install tile, we use a liquid applied waterproofing membrane under the tile. This adds a waterproof layer that helps protect against leaks.

All 25 standard design features

How it works

From first call to keys

  1. Consult
    A free conversation with Max
  2. Design
    Pre-approved, one of our plans, or custom
  3. Permits
    We pull them
  4. Build
    Our own crew, about 4–6 months for an ADU
  5. Keys
    Finals and walkthrough

How a Redwood ADU project runs

On YouTube

From the job site, on video

Foundation pours, plumbing walkthroughs and finished-home tours, filmed on our own jobs. Visit the Redwood ADU YouTube channel.

Video thumbnail: Myrtle Ave ADU tour, West Sacramento

Myrtle Ave ADU tour, West Sacramento

Video thumbnail: In-slab ADU plumbing, part 2

In-slab ADU plumbing, part 2

Video thumbnail: 25 Thoughtful ADU Project Upgrades

25 Thoughtful ADU Project Upgrades

Video thumbnail: Top 5 Unexpected ADU Costs

Top 5 Unexpected ADU Costs

Video thumbnail: What are Pre-Approved ADU plans?

What are Pre-Approved ADU plans?

Video thumbnail: In-slab ADU plumbing, part 1

In-slab ADU plumbing, part 1

Let’s talk about your backyard.

A free 10–15 minute call with Max. Honest feasibility, no sales pitch.

Request a Consult