Built in Sacramento
Attention to the job, not to the next sale.
Max is on site in every Redwood ADU project. The person who writes your contract is the person who builds it.
We keep our schedule to the jobs we already have and build them well. No sales team and no overbooking: when we take your job, it gets our full attention.
- Max on every job
Sales, permits and the build, one person - over 80% in-house
Foundation and plumbing self-performed - Two jobs at a time
We only run two, so yours never stalls - Design + build in-house
Max designs it in 3D, our crew builds it
The work
Finished projects, start to finish
Fastest path to an ADU
Pre-approved plans. A clearer starting point.
Compare City of Sacramento and Sacramento County layouts and review the scope behind each published estimate, from $168,000. We confirm current pricing, utility requirements, agency fees and site conditions before you sign.
Studio
About 367 sf · Studio · 1 bath
$168,000 · upgraded $215,000
Published estimate, 6/24/2025
1-Bed
About 559 sf · 1 bed · 1 bath
$195,000 · upgraded $240,000
Published estimate, 7/7/2026
2-Bed
About 747 sf · 2 bed · 1 bath
$204,000 · upgraded $248,000
Published estimate, 6/24/2026
Elderberry
About 998 sf · 2 bed · 2 bath
$274,000
Published estimate, 8/12/2025
Magnolia
About 1,184 sf · 3 bed · 2 bath
$289,000
Published estimate, 8/26/2025
Build quality
Details we include that others don’t
Washer/Dryer Boxes
We include an inset washer hookup box with water supply and drain. Also, we include an inset dryer exhaust cavity so the dryer hose fits neatly in the wall and the dryer can slide all the way back to the wall.
Superior Window Flashing
For a durable, leak-resistant window installation, we use a couple of specialty products. First, we use a high-quality oil-based sealant between window flange and wall. Next, we use an upgraded Butyl flashing tape to flash the exterior of the window to the wall.
Silicone in Tile Inside Corners
Inside corners are the first places grout will crack as the building experiences slight movement over time. For this reason, before installing grout, we use silicone at all critical joints, and any joints prone to cracking. This helps keep those joints sealed and watertight over time.
Roll-on Moisture Barrier under Tile
Whenever we install tile, we use a liquid applied waterproofing membrane under the tile. This adds a waterproof layer that helps protect against leaks.
How it works
From first call to keys
- Consult
A free conversation with Max - Design
Pre-approved, one of our plans, or custom - Permits
We pull them - Build
Our own crew, about 4–6 months for an ADU - Keys
Finals and walkthrough
On YouTube
From the job site, on video
Foundation pours, plumbing walkthroughs and finished-home tours, filmed on our own jobs. Visit the Redwood ADU YouTube channel.
Myrtle Ave ADU tour, West Sacramento
In-slab ADU plumbing, part 2
25 Thoughtful ADU Project Upgrades
Top 5 Unexpected ADU Costs
What are Pre-Approved ADU plans?
In-slab ADU plumbing, part 1
Let’s talk about your backyard.
A free 10–15 minute call with Max. Honest feasibility, no sales pitch.
