top of page

Create Your First Project

Start adding your projects to your portfolio. Click on "Manage Projects" to get started

Sutter St., Woodland

Completion Date

July 2024

Bedrooms

Three

Bathrooms

Two

Project Cost

$250k

Location

Woodland, CA

SQFT

1000 Remodel 350 Addition

Project Type

Addition

This property was in need of some major TLC when construction started. The existing 2 bed 1 bath house had termite damage, dry rot, and had not been remodeled since it was first built in 1950. Additionally, the house was mistreated and worn down from years of neglect. By adding a 350 sqft addition, the floor plan could now accommodate an extra bedroom and bathroom. The entire building was re-sided, including closed soffits and gable accents. The entire electrical, plumbing and HVAC systems were re-done, including dual fuel at all appliances. Thoughtful design elements include: an attic fan to reduce attic/house temperature, whole house fan to reduce AC use, commercial grade vinyl flooring, under-cabinet lighting, crown molding throughout, and pre-wiring for exterior cameras.

Check out our YouTube Channel!

ADU Consultation #contractor #construction #sacramento #adu

Redwood ADU
ADU Consultation #contractor #construction #sacramento #adu
ADU Consultation #contractor #construction #sacramento #adu

ADU Consultation #contractor #construction #sacramento #adu

00:48
25 Thoughtful ADU Project Upgrades

25 Thoughtful ADU Project Upgrades

08:57
40 yard foundation pour #contractor #construction #sacramento #adu #concrete #designbuild

40 yard foundation pour #contractor #construction #sacramento #adu #concrete #designbuild

02:09
Top 5 Unexpected ADU Costs

Top 5 Unexpected ADU Costs

09:58

(916) 905-4710

Sacramento, CA 95817
CSLB LIC 1098046

  • Youtube
  • LinkedIn

© Redwood ADU LLC. Proudly created with Wix.com

bottom of page