Redwood ADU, Built in Sacramento Request a Consult

ADU questions, answered

How much does an ADU cost?

Our published estimates for City of Sacramento pre-approved plans start at $168,000 (Studio) and for County plans at $274,000. Each estimate is dated and broken down trade by trade on the Pre-Approved Plans page. Current pricing, utility requirements, agency fees and site conditions are confirmed for your property at the consult. Custom ADUs are priced after a site visit.

Do ADUs 750 square feet or smaller avoid impact fees?

Yes. Under California Government Code §66311.5, a local agency, special district or water corporation cannot impose any impact fee on an ADU with 750 square feet or less of interior livable space, or on a junior ADU with 500 square feet or less. An ADU of exactly 750 square feet qualifies.

For an ADU larger than 750 square feet, any impact fees must be charged proportionately in relation to the square footage of the primary dwelling.

Impact fees are separate from utility connection or capacity charges, school-district fees, and building permit, plan-check and inspection fees. A smaller ADU can save real money, but it is not automatically fee-free.

Coming January 1, 2027: under SB 1117, for the first two ADUs on a lot, impact fees on an ADU larger than 750 square feet will be calculated only on the area above 750 square feet, still in proportion to the main house. The full exemption for ADUs of 750 square feet or less stays the same.

Sources: Gov. Code §66311.5 (official text) · California HCD ADU Handbook (Fees section)

General information, checked November 2026; not legal advice. We confirm the fees that apply to your project with the city or county, school district and utilities.

How long does an ADU take?

Typically 10–15 months from first call to keys for a custom-plan ADU. Construction runs about 4–6 months; design, engineering and permitting take the rest. Remodels and additions vary with scope.

Do you pull the permit?

Yes. We apply for the permit, handle corrections and coordinate inspections.

Who will I work with?

Max. He sells, permits and runs the build, so you have one point of contact throughout.

Are you licensed?

Yes. Redwood ADU LLC holds California CSLB license #1098046.

Can I reuse one of your plans?

Yes. Reusing a plan we have already built saves drafting and engineering. See Our Plans.

Let’s talk about your backyard.

A free 10–15 minute call with Max. Honest feasibility, no sales pitch.

Request a Consult