Studio
About 367 sf · Studio · 1 bath
$168,000
Upgraded package: $215,000
Published estimate dated 6/24/2025
Fastest path to an ADU
The City and County have already approved these plans, which cuts design and engineering cost and speeds up permits. Compare the published scope and finish options, then ask us to confirm current pricing for your property.
Published estimates, with the date each was prepared. A pre-approved floor plan does not eliminate site-specific review, utility requirements or agency fees.
| Plan | Program | Size | Published base | Published upgrade | Estimate date |
|---|---|---|---|---|---|
| Studio | City of Sacramento | About 367 sf · Studio · 1 bath | $168,000 | $215,000 | 6/24/2025 |
| 1-Bed | City of Sacramento | About 559 sf · 1 bed · 1 bath | $195,000 | $240,000 | 7/7/2026 |
| 2-Bed | City of Sacramento | About 747 sf · 2 bed · 1 bath | $204,000 | $248,000 | 6/24/2026 |
| Elderberry | Sacramento County (unincorporated) | About 998 sf · 2 bed · 2 bath | $274,000 | No separate upgrade | 8/12/2025 |
| Magnolia | Sacramento County (unincorporated) | About 1,184 sf · 3 bed · 2 bath | $289,000 | No separate upgrade | 8/26/2025 |
City of Sacramento Shelf Ready ADU Plans (official) ↗
About 367 sf · Studio · 1 bath
$168,000
Upgraded package: $215,000
Published estimate dated 6/24/2025
About 559 sf · 1 bed · 1 bath
$195,000
Upgraded package: $240,000
Published estimate dated 7/7/2026
About 747 sf · 2 bed · 1 bath
Now building on this plan. See it built
$204,000
Upgraded package: $248,000
Published estimate dated 6/24/2026
Sacramento County Shelf Ready ADU Plans (official) ↗ · County plans can only be used in unincorporated Sacramento County.
About 998 sf · 2 bed · 2 bath
$274,000
Single published package
Published estimate dated 8/12/2025
About 1,184 sf · 3 bed · 2 bath
$289,000
Single published package
Published estimate dated 8/26/2025
Each breakdown lists every trade with its scope and specs, plus overhead and profit, so you can see where the money goes. Current pricing, utility requirements, City and County permit and utility fees, and site conditions are confirmed for your lot at the consult, before you sign.
A free 10–15 minute call with Max. Honest feasibility, no sales pitch.