About

Max is on every job

Redwood ADU is built around one idea: the person who writes your contract is the person who builds it.

Max Kellogg in front of a finished Redwood ADU on Jonas Ave., Sacramento

Why we work this way

Max handles the sale, designs most of our plans, helps with permits and runs the build in the field. There is no hand-off from a salesperson to a project manager you have never met.

We focus on building the jobs we already have well, not on chasing the next sale. We take on only what our crew can give full attention to, and over 80% of the work is done in-house, including foundation and plumbing.

Design

Max draws the floor plans

Most Redwood ADUs start as a floor plan Max designs himself, built around your lot, your budget and how you’ll live in the space. Then the same person who drew it builds it, so what’s on paper is what our crew can actually build well.

Plans Max designed and we built:

Browse all of Our Plans

Redwood ADU 3D design render of a new primary bedroom, drawn by Max
From one of Max’s 3D designs (Capwell Way addition, Elk Grove).

The team

Max leads a small in-house crew that self-performs over 80% of every build, including foundation and plumbing.

Max Kellogg, Owner at Redwood ADU

Max Kellogg

Owner

Max is the main point of contact for all customers - from initial site visit and sketch to on-site logistics and final job walkthrough. Max specializes in concrete, electrical, plumbing, framing, and windows.

Jeffrey Alger, Apprentice Installer at Redwood ADU

Jeffrey Alger

Apprentice Installer

Jeff is creative and thoughtful, always bringing new solutions to the table. He contributes to the team with skills in concrete, excavation, welding, and much more!

Paul Busenitz, Journeyman Installer at Redwood ADU

Paul Busenitz

Journeyman Installer

Paul is thorough and thinks one step ahead, solving problems before they come up. Paul specializes in framing, siding, and electrical.

Ivan Katiushko, Apprentice Installer at Redwood ADU

Ivan Katiushko

Apprentice Installer

Ivan is extremely hard working, and always smiling. Ivan specializes in flooring, tile, roofing, and excavation.

We’re hiring careful people. See careers.

Key partners

We do most of the work ourselves. For the rest, we use the same trusted local trades on every job.

River City Heating & Cooling

HVAC and mini splits (owner Geordie)

Website ↗

CMC Custom Cabinets

Custom cabinetry

Genoa Soapstone

Countertops: soapstone, marble and granite

Website ↗

How it works: custom plan timeline

Typical time for an ADU from first call to keys: 10–15 months. Construction itself runs about 4–6 months. Pre-approved plans skip most of design and engineering. These timelines apply to ADUs, not to remodels or additions, which vary with scope.

  1. Consultation
    Pre-construction

    We review your lot from satellite view, do a rough feasibility check and give a ballpark quote. Then a site visit with measurements.

    Time: ~1 hour

    Cost: Free

  2. 3D design
    Pre-construction

    A full 3D model of your ADU with revisions until it’s right, then an initial detailed quote. Design contract signed.

    Time: 2–4 weeks

    Cost: Free

  3. Drafting & engineering
    Pre-construction

    Architectural plan set, engineering analysis and stamp, Title 24 energy analysis, solar design, and plan revisions. Ends with final construction plans and a contract with final pricing.

    Time: 2–3 months

    Cost: $6,000–$10,000

  4. Permitting
    Pre-construction

    Redwood ADU applies for the permit and handles corrections. Once it’s ready to issue, fees are paid, the permit is issued, and we schedule the build.

    Time: 2–3 months

    Cost: We handle the permit process; city and county fees are passed through at cost.

  5. On-site construction
    Construction phase

    Our own crew builds it, start to finish: site prep, foundation, framing and roof, rough-ins, insulation, drywall, siding and finishes, with city inspections at each step. Ends with a final inspection and a walkthrough with Max.

    Time: ~4–6 months

    Cost: Construction contract (the bulk of the cost)

FAQ · Financing · Check our CSLB license #1098046

On YouTube

From the job site, on video

Foundation pours, plumbing walkthroughs and finished-home tours, filmed on our own jobs. Visit the Redwood ADU YouTube channel.

Video thumbnail: Myrtle Ave ADU tour, West Sacramento

Myrtle Ave ADU tour, West Sacramento

Video thumbnail: In-slab ADU plumbing, part 2

In-slab ADU plumbing, part 2

Video thumbnail: 25 Thoughtful ADU Project Upgrades

25 Thoughtful ADU Project Upgrades

Video thumbnail: Top 5 Unexpected ADU Costs

Top 5 Unexpected ADU Costs

Video thumbnail: What are Pre-Approved ADU plans?

What are Pre-Approved ADU plans?

Video thumbnail: In-slab ADU plumbing, part 1

In-slab ADU plumbing, part 1

Let’s talk about your backyard.

A free 10–15 minute call with Max. Honest feasibility, no sales pitch.