ADU · Sacramento
53rd St ADU
Completed Jul 2024
Permit issued Oct 2023 · Completed Jul 2024 (about 9 months)
Two ADU units (546 and 651 sf, 1,197 sf total) in a two-story garage conversion, plus a new workshop addition. The exterior matches the existing Sacramento house, down to the siding exposure and window trim.
1 / 6
- City / AHJSacramento / City of Sacramento
- Size1,197 sf
- Project typeDuplex: two ADU units in a 2-story garage conversion
- LayoutTwo units, 1 bed / 1 bath each
- Ballpark costAbout $295k
- PermitRES-2316476
The challenge
The owners wanted two separate ADU units without losing the utility of their heavily used detached garage.
Our solution
Instead of tearing it down, we built up: a two-story garage conversion with two separate ADU units (546 and 651 sf).
What made it unique
Details from this build
Exterior matched to the house
The exterior exactly matches the existing house: 5" exposure lap siding, belly band, knee braces and window trim.
Stairs with a skirt board
Stairs with a skirt board and matching flooring.
Large-format bath tile
Large-format tile in the bathroom keeps grout lines to a minimum.
Our characteristic window trim
Our characteristic window trim with a custom stool and apron.
Finished project
The finished 53rd St ADU
26 photos taken at completion. Tap any photo to view them full screen.
Exterior
Living & kitchen
Bedroom
Baths
Stairs
Along the way
Built by our own crew
Every stage, built by our own crew.
Site prep & demo
Foundation
Framing
Roofing & sheathing
Rough plumbing, electrical & HVAC
Insulation
Exterior siding & stucco
Interior finishes: cabinets, tile & paint
Final & finished
Plans
Drawings from this project's plan set. Click any drawing to open the full gallery.
Like this layout? Many of our plans can be reused, which saves on drafting and engineering. See Our Plans.