In ProgressMain build complete; upstairs loft finishing under a change order.
Permit issued Apr 2026
A high-end ADU with 10 ft ceilings, 8 ft windows, an attic loft with shed dormer, and a large open kitchen and living area. The main build is done; we are now finishing the upstairs loft under a change order (new attic door, sub-panel, LVP flooring and stair lighting).
Two bedrooms, two bathrooms and a covered porch fit into this 997-square-foot ADU, with tall ceilings and an open kitchen/living area.
1 / 5
- City / AHJWest Sacramento / City of West Sacramento
- Size997 sf
- Beds / baths2 / 2
- Ballpark costAbout $396k
- Permit25-12-045E
The challenge
The owners wanted attic space that could be finished later, plus a large driveway to make the property practical for rental use.
Our solution
We designed the ADU with a finishable attic and shed dormer, tall main living spaces and extensive driveway flatwork for rental use. The main build is complete; the upstairs loft is now being finished under a change order.
What made it unique
Details from this build
Large cathedral ceilings
Large cathedral ceilings in the main living space.
Very large windows
Very large windows bring in lots of light.
Built-in blinds
Built-in blinds in the rear door.
Extensive flatwork
Extensive concrete flatwork around the building and the driveway.
Full-property landscaping
Landscaping across the whole property, with drainage, weed barrier and gravel.
Andersen windows
Andersen windows.
Our characteristic porch
Our signature covered porch: rough redwood posts and beams with a tongue-and-groove/V-groove pine soffit.
Large island
A large kitchen island with a barstool overhang.
Matching sheds
Sheds built to match the ADU.
Large-format bath tile
Large-format tile in the bathrooms.
Custom bench seat
A custom-built bench seat.
Coat closet by the entry
A coat closet by the entry.
Outdoor sink
An outdoor sink.
Lighted mirrors
Lighted mirrors in the bathrooms.
Designed in 3D first
From model to finished home
Before we build, Max models the project in 3D so the owners can walk through the layout and finishes. Here is the 3D design render next to the finished build.
Finished project
The finished Myrtle Ave ADU
25 photos taken at completion. Tap any photo to view them full screen.
Exterior
Kitchen & living
Bedrooms
Baths
Details
Along the way
Built by our own crew
Progress so far, photographed by our crew on site.
Site prep & demo
Foundation
Framing
Roofing & sheathing
Rough plumbing, electrical & HVAC
Exterior siding & stucco
Drywall
Interior finishes: cabinets, tile & paint
Final & finished
Plans
Drawings from this project's plan set. Click any drawing to open the full gallery.
Like this layout? Many of our plans can be reused, which saves on drafting and engineering. See Our Plans.